Company Profile

Needs Assessment

Software Selection

Training Program

Project Execution

Downloads

Request Form

Contact Us

 

  • Tracks "life to date" labor and material cost, and produces an Asset Management Report.

  • On screen standard straight line depreciation for all equipment.
  • Spares function allows user to assign a spare parts code to each equipment item that will produce spare parts report.
  • Provides a hierarchical relationship of system, unit, and sub-unit. Each system, unit and sub-unit has unlimited number of levels.
  • Allows any number of meters to be linked to each equipment record, with PM work orders to be generated by frequencies or meter readings.
  • Equipment can be tracked by type, cost center, dept., GL codes and asset numbers.
  • Has capability to link graphic file to each equipment record.
  • Safety notes and OSHA regulations can be linked to the equipment record.
  • Contains single equipment tasks, multi-equipment tasks, task instructions, required labor and required parts listing.
  • Task frequency allows setting of the PM intervals by day, week, month, bi-month, quarter, semiannual, annual.
  • Allows meter-based frequency along with time based, which ever comes first.
  • Allows recording the downtime required for each PM, i.e. the amount of time that production will lose the equipment to maintenance.
  • Allows graphic file formats to be linked to the PM task.
  • Multi-equipment task function (multi-task) shall allow linking of a PM work order to any number of equipment records.
  • Tasks may be assigned start-end season dates.
  • Allows merging tasks for equipment with larger frequencies due around same period.
  • Allows tracking work order data and labor data expended against each work order including regular hours,overtime hours and cost associated with parts.
  • Manually or automatically generates all required work orders for the facility.
  • Allows the generation of a work order against any number of equipment.
  • On-screen look-up tables provide for equipment numbers, task numbers, employees, crafts, vendors, reason for failure codes, cost centers, and expense codes.
  • Work order history can be edited after the work order has been closed.
  • Print a report on all work orders backlogged with aging, open and closed.

<<Previous

 

More>>